uMngeni Interchange partially closing for bridge repairs

Loading player...
If you use the N2 at the uMngeni Interchange, you’ll want to plan ahead. SANRAL has confirmed that construction work will run from 12 March until 15 April 2026, with temporary lane closures and disruptions expected around the interchange.
Crews will be replacing bridge parapets and median barriers on the uMngeni Bridge, which means sequential lane closures on key routes including the northbound N2 off-ramp, the southbound on-ramp from Inanda Road, and sections of the fast lanes in both directions.
Traffic will still move through the area, but lanes will be narrower and delays are expected.
Motorists are being urged to allow extra travel time, follow signage, and stick to reduced speed limits while travelling through the construction zone.
12 Mar 2AM English South Africa Society & Culture · Daily News

Other recent episodes

From pain to possibility: A deep dive with Dawn, Mussabiaha & Linden

In this heartfelt conversation, we sit down with Dawn, Mussabiaha and Linden to hear their stories firsthand. They open up about living with chronic pain, the daily challenges their medical conditions bring, what it means to be selected as one of the final three, and how this life-changing procedure could…
14 Jul 3AM 8 min

KZN drivers warned: The new AARTO system could cost you your licence

The Aarto rollout is expanding across KwaZulu-Natal, bringing South Africa one step closer to a nationwide demerit points system. What does this mean for your traffic fines, driving record and licence? East Coast Radio speaks to KZN Department of Transport spokesperson Ndabezinhle Sibiya to unpack what every motorist needs to…
9 Jul 1AM 7 min